Construction began in 1924 on what would be only the
Belleville Bridge's first life.
|
The following is the text from Wayne County's winning submittal
to the American Public Works Association for it's project to
relocate and replace the historic Belleville Bridge. The project
won because of its uniqueness and was considered 'outstanding
in all areas judged.'
WHAT MAKES THE BELLEVILLE BRIDGE replacement so significant is
not the level of impact it had on its community. Nor is it the
size or scope of the project.
What makes the Belleville Bridge project so special is the effort
that was given to the oft-forgotten side of engineering: Saving
a great work from the past [in this case, to prepare for the new].
In going to such uncommon measures to preserve a small piece of
history, those involved became part of an engineering odyssey that
will surely have historic relevance years from now for the profession.
In short, the real significance of Wayne County's Belleville Bridge
project is the cooperation, dedication and innovation needed to
accomplish the seemingly simple feat of replacing an old bridge.
EARLY HISTORY
THE BELLEVILLE BRIDGE was built in 1925 by the Wayne County Road Commission
to replace a smaller structure that spanned the Huron River. Today, the bridge
spans part of the five-mile long Belleville Lake, which was created when
a river dam was built in 1925 as part of a Detroit Edison Hydroelectric plant.
Back then, the city of Belleville was a sparsely populated town
about an hour-and a-half drive to downtown Detroit along Michigan
Avenue. Today, it's a burgeoning city a stone's throw from Interstate
94, which will get you downtown in about 30 minutes.
|

The span first opened in 1925.
|
During the first 70 years of its life, the Belleville Bridge was
one of the state's few riveted camelback pony truss bridges. It
made for a unique and striking entryway to the city of Belleville
from the north. It could be said that the bridge was Belleville's
signature structure.
It was also significant because, according to the State Historic
Preservation Officer, the bridge "represents a relatively
early use of riveted Warren truss construction that became the
norm for pony truss structures in succeeding years."
In 1925, the bridge survived a scare when the earthen embankment
abutting the dam broke and "gave way to a roar that could
be heard for several miles," according to resident Dr. Samuel
Robbe. While the young lake was completely drained in the event,
the bridge itself sustained only minor damages.
:: back to the top ::
RECENT HISTORY
IN 1985, WAYNE COUNTY engineers conducted traffic studies to determine what
they already knew: The two-lane Belleville Bridge could no longer accommodate
the traffic volumes being placed on it. Designed to handle up to 18,000 vehicles
per day, it was often seeing 23,000. And the city was still growing. In addition, inspections showed that while the metal truss structure
was sound, the concrete abutments below the bridge were showing
signs of weakening. The county sent a Critical Bridge application
to the state for replacement funding.
In October of that year, the funds were approved and the county
began sending out requests for design consultants. One of those
who applied was Alan Halbeisen of W.W. Engineering & Science.
While he would not get the job, he later would play a critical
role in the project.
On January 15, 1986, Wayne County received a letter from the Deputy
State Historic Preservation Officer. In it, she stated that the
Belleville Bridge was potentially eligible for the National Register
of Historic Places as an example of a riveted camelback pony truss.
Removing the bridge would dilute its historical significance.
A week later, the county was informed by the state than an Environmental
Assessment [EA] would be required before the project could proceed.
Already, this had the makings of a complicated project.
:: back to the top ::
|
Right next to the classified ads for poodles puppies and sheepdogs was
a chance to buy a historic bridge.
|
After completing a draft of the EA, the county was informed by
the state that certain other conditions needed to be met before
proceeding with the bridge's replacement, one of which would change
the course of the project: Wayne County had to decide whether or
not it wanted to keep the old bridge. If the county didn't want
to keep the bridge, it had to try and sell it.
Wayne County's director of engineering, Ed Siemert, knew he had
a dilemma. He was either going to have to tear down a structurally
sound historic bridge, or, somehow, find it a new home.
After a great deal of consideration, and with no known precedent,
he chose the latter. In doing so, he launched a public works juggling
act that, despite its relatively small scale, would require more
creativity, inter-governmental cooperation and seat-of-the-pants
planning than any project he had been involved in during his 30-year
career. Not to mention a decent sense of humor.
In fact, the project, which resulted in a unique three-way Michigan
bridge trade, has been dubbed in the media a "case of musical
bridges," "a bridge too far," and a "recycling
program for historic bridges." It has even generated television
stories, such as the one where the reporter peeks out from behind
some bushes and whispers to the camera, "Psst. Hey buddy,
wanna buy a bridge?"
Despite the novelty of the project, the replacing of the Belleville
Bridge is certainly one of the most interesting and complex public
works projects Wayne County has ever seen. It has involved one
township, two cities, two counties, the State of Michigan and the
FHWA. It also has involved three bridges in two regions of the
state; one lake, two rivers, dozens of community meetings; a decade
of planning; two years of construction and a lot of luck.
"If we had decided to scrap the old bridge, it would have
been a lot easier," recalls Siemert, who has overseen the
project from its beginning. "But it was a perfectly good bridge
we had just outgrown.
"So, we decided to try and sell it."
"Psst. Hey buddy, wanna buy a bridge?"
Only he meant it. And this is where the story really begins.
:: back to the top ::
|

Media across the state, including the Associated Press, have chronicled
this unique story.
|
THE ODYSSEY
INDEED, IN JULY OF 1989, the county took out classified ads. The
county's sales pitch began with this straightforward heading "Bridge
Available for Relocation."
In the Sunday Detroit News, the ad was placed next to other ones
for AKC puppies. [As if someone reading the classifieds on that
day who was thinking of purchasing a Labrador Retriever, would
instead decide, "Naw, this bridge looks like a better deal."]
In addition to the Detroit News the county also took out ads in
the Detroit Free Press and the Michigan Contractor & Builder.
The county also sent letters to nine public agencies across the
state, hoping for some interest.
To sweeten the pot, the county even offered to pay relocation
fees up to the amount it would have cost to demolish the bridge
[about $100,000]. But try as it might to peddle the metal structure,
the county had no takers. Even a flourish of media stories produced
no results.
There were, however, two semi-serious prospects: The City of Detroit
was interested in putting the bridge in one of its parks over the
Rouge River. And an airline pilot had a notion to move the bridge
to his sprawling property in the State of Washington, or even to
use it there as a public bridge.
Alas, neither of the prospects panned out and eventually the county
decided it would have to scrap the historic structure.
'Maybe it just wasn't a realistic idea to sell, or even give away
a bridge,' Siemert thought.
After all, it was hard enough trying to find someone who wanted
a 70-year-old riveted camelback pony truss bridge. To make things
more difficult, conditions the county had to abide by stated that
if sold, the bridge had to be kept up in such a way as to maintain
its historical significance and that it have adequate safety and
capacity features to serve as a public bridge.
While the county abandoned its search for takers and requested
approval from the state to demolish it, planning began for the
new bridge. [Since the historic twist had stalled the project in
1988, the county had to again advertise for consultants.] Plans
also included widening and reconstructing about a mile of Belleville
Road, from I-94 to the bridge, which led directly to the city's
vibrant downtown.
The project would be finished in one year, but would require the
complete closure of the road during that time. "Wrong," said the members of the Belleville Central
Business District. "We'll all go out of business if our major
thoroughfare is closed for a year."
After several meetings, phone calls and letters between the county
and city officials, merchants and residents, the county agreed
to provide for the new bridge's construction to be phased over
two years. It mean keeping the road open, but it also meant a two-year
inconvenience instead of one. The city was willing.
Another hurdle had been jumped.
Then the rumblings began that since the road leading into town
was being widened to four and five lanes and the bridge to four,
the county surely would no longer allow two lanes of parking along
Main Street, the four lane extension of Belleville Road through
downtown. From an engineering standpoint, that made sense. But
understanding the need for parking in a central business district,
the county decided to keep both parking lanes available, despite
the continued fear of merchants.
:: back to the top ::
THE CONNECTION IS MADE
WHILE WAYNE COUNTY went about its business, Al Halbeisen, who had
sought a contract on the Belleville Bridge project a year and
a half earlier, was
working with the City of Portland, Michigan, on a project called "Rails
to Trails." Portland was looking for a small bridge to be used for pedestrian
traffic and recreation use over the Looking Glass River. He had hoped to
find an existing one-lane structure that could be rehabbed and moved, or
perhaps salvage one that was being thrown away.
His search took him to nearby Lowell to the Burroughs Street Bridge
over the Flat River. There, he found that, yes, not only did the
Kent County Road Commission need to replace the bridge because
it could no longer support vehicle traffic, but they were willing
to give it to him.
There was, of course, the significant issue of a replacement.
About a week later something stuck in Halbeisen's mind when thinking
about the Burroughs Street BSridge, sort of a sense of dejá vu.
Then it hit him: Both the Burroughs Bridge and the Belleville Bridge
were 120 feet in length.
The connection was made.
After taking a closer look at both bridges' specifications, and
the needs of the respective communities, Halbeisen realized that
everyone's needs could be met with only Wayne County having to
construct a new bridge. The others could be saved.
"It was a fluke," said Halbeisen. "It's not like
we go shopping these things around." That was, however, exactly
what Wayne County had tried.
As luck would have it, the recently-enacted Intermodal Surface
Transportation Efficiency Act [ISTEA] of 1991provided funds for
historic preservation and for pedestrian transportation facilities.
Kent County and Portland submitted their applications just prior
to the October 15 deadline.
"We had been proceeding under the assumption we were going
to have to demolish the old bridge," said Wayne County's Siemert. "Then,
in the bottom of the ninth inning, this came along."
Another major hurdle had been cleared.
:: back to the top ::
WORK GETS UNDER WAY
SINCE KENT COUNTY'S Burroughs Street Bridge had been closed to traffic for
about six months, they were anxious to get their new one. But before Wayne
County could start dismantling its old bridge, half of the new one had to
be constructed to keep traffic flowing, as per the agreement with downtown
merchants.
The new structure would be a four-lane, three-span reinforced
concrete highway bridge, which would not resemble the original.
In order to provide a design that would be in harmony with the
community, the design consultant hired a local graphic artist to
do conceptual drawings.
|

Nearly in reverse order of its 1925 construction,
the Belleville Bridge was dismantled "rivet by rivet."
|
His drawings included features such as old-fashioned light poles
and ornamental aqua blue-colored wrought iron parapet railings
capped with gold rosettes. Each side of the bridge had four brick
bollards capped with three-foot limestone spheres, which provided
a handsome transition from old to new.
The superstructure of the new bridge utilizes 45" deep precast,
prestressed concrete I-beams. The beams were placed in each span
and then made structurally continuous for live load. The main reason
for continuity was the elimination of deck joints and deck drainage
onto the structure. Continuity also improved the bridge's look
and riding quality.
The substructure consists of conventional cantilevered abutments
supported on steel H-piles and pier caps supported on cast-in-place
concrete piles. The depth of the water made pile driving and construction
difficult and required the use of cofferdams and tremie seals at
the abutments.
Having learned a lesson from the original construction of the
bridge in 1924, extra effort was paid to the earthwork of the causeways.
After the original construction, a large section of pavement had
to be replaced when it collapsed due to settling soil. Fortunately,
perhaps thanks to the extra effort this time around, no such settling
appears to be taking place on the causeways.
There were, of course, unexpected surprises.
In addition to the extra earth work, the original truss bridge
contained a series of communications cables that served much of
southwestern Wayne County. Since these cables could not be removed,
they needed to be protected and constantly looked after throughout
the two-year project. The project was completed with no damage
to the cables and no interruptions in service.
:: back to the top ::
DISMANTLING
|
Once
spanning the Flat River near Grand Rapids, Michigan, this
historic bridge now traverses the Looking Glass river in
Portland, Michigan.
Look
familiar?
The old "Belleville Bridge" is now enjoying
its new life over the Flat River in Kent County, Michigan.
|
WITH GREAT ATTENTION TO DETAIL, crews did an in-depth study of
the original construction of the bridge and essentially attempted
to perform that same construction - in reverse. The bridge was
dismantled rivet by rivet, with great attention being paid to not
jeopardizing the structural integrity of the span.
During much of the process, floating pontoons were employed to
provide support from a work platform in the lake.
Over the two weeks the bridge was dismantled, a bond was formed
between the construction crew and local residents. Whenever somebody
wanted a souvenir from the old bridge, they were given rivets that
did not need to be saved.
And, as is often done when a structure is completed, crews placed
an American flag, but again, things were in reverse. Instead of
putting it atop the finished new bridge, it was placed on the bridge
about to be dismantled. As each section was removed, the flag would
be placed on the next section. The fact that this transpired around
the Fourth of July holiday, made the gesture especially popular
among residents.
By the time the bridge was dismantled and ready to ship to Grand
Rapids for repainting, the Burroughs Street Bridge had been rehabbed
and was in place in its new home over the Looking Glass River [top
photo].
After about nine months of having to use detours, Kent County
motorists finally were able to take Burroughs Street over the Flat
River again in September, when the bridge that started the whole
odyssey [middle photo] was reassembled.
Finally, and appropriately, at Christmas time, Belleville
residents untied the ribbon on their new road and bridge [bottom],
marking a new beginning.
|