DPS Roads Directory

wayne county dps road commission  
   

Structure Maintenance Section

Responsible for maintaining and appraising the structural integrity of the 308 bridges on the Wayne County road system and 840 bridges on State trunklines and freeways in Wayne County.

This Section is also responsible for the maintenance and operation of 162 storm water pump stations [546 pumps] and 207 impact attenuators. The Building Maintenance Unit of this section maintains 18 Roads Division maintenance yards, 6 salt storage yards, the Neudeck Building and some Parks Division facilities.

In addition, this Section also maintains 7 bridges, 4 tunnels, and 12 pumphouses for the Airport Authority.

:: back to the top ::

 

 
Lorenzo Blount
Director

 

     

The Bridges of Wayne County

Dix Avenue Over Rouge River
Type: Double-leaf Trunion bascule [Drawbridge]
Operates: Around-the-clock
Constructed: 1926
Length: 222 ft.
Staff: Four full-time operators
Operating Cost: $330,500
Ships Per Year: 1,161
Fort Street Over Rouge River
Fort Street Bridge Type: Double-leaf Trunion bascule [Drawbridge]
Operates: Around-the-clock
Constructed: 1922
Length: 222 ft.
Staff: Four full-time operators
Operating Cost: $250,500
Ships Per Year: 2,149
 
Jefferson Over Rouge River
Jefferson Bridge Type: Double-leaf Trunion bascule [drawbridge]
Operates: Around-the-clock
Constructed: 1922
Length: 248 ft.
Staff: Four full-time operators
Operating Cost: $277,500
Ships Per Year: 2,379
Grosse Ile Over Detroit River
Grosse Ile Bridge Type: Camelback through truss & girder [swing bridge]
Operates: Around-the-clock [March 15 - Dec. 15]
Constructed: 1933
Length: 1380 ft. (380-ft. swing section)
Staff: Four full-time operators [when open]
Operating Cost: $214,800
Ships Per Year: 787
Belleville Bridge
Belleville Bridge
Winner
1996 Project of the Year
American Public Works Association
Type: Three span reinforced concrete [non-moveable]
Features: Wrought iron parapet railings capped with gold rossettes; brick bollards capped with limestone spheres
Constructed: 1995-96 to replace original structure
Length: 222 ft.
Construction Cost: $1.8 million

:: back to the top ::