Share:
Font Size:

Thank you for your patience while we replace the Miller-Rotunda bridge in the city of Dearborn.

WHAT'S BEING DONE?

The bridge is scheduled to close on Monday, August 14, 2023, due to the critical condition of the structure. Wayne County previously increased the frequency of inspections to the bridge to ensure that any safety issues that arise do not go undetected. A recent inspection increased concerns for the safety of motorists and it has been decided that the bridge will close until a full replacement has occurred. Wayne County considers the safety of the public our highest priority.

WHEN WILL WORK TAKE PLACE?

The demolition of the bridge is scheduled to begin at the end of 2023. The bridge replacements will be complete by late summer 2026.

WHAT SHOULD I EXPECT?

To complete this work, Miller and Rotunda bridges will be closed to thru traffic for the duration of the project.

Posted detours will be as follows:

Miller Road Posted detour:

*Northbound: Northbound Miller Road traffic will be detoured with signage utilizing Eastbound Eagle Pass to Northbound Wyoming Avenue to Westbound Michigan Avenue (US-12) and ending at Miller Road.

*Southbound: Southbound Miller Road traffic will be detoured with signage utilizing Eastbound Michigan Avenue (US-12) to Southbound Wyoming Avenue to Westbound Eagle Pass and ending at Miller Road.

Miller Road via Oakman Boulevard Posted detour:

*Southbound: Southbound Oakman Boulevard traffic will be detoured with signage utilizing Northbound Miller Road to Eastbound Michigan Avenue (US-12) to Southbound Wyoming Avenue to Westbound Eagle Pass and ending at Miller Road.

Miller Road via Rotunda Drive Posted detour:

*Northbound: Eastbound Rotunda Drive traffic will be detoured with signage utilizing Eastbound Rotunda/Schaefer Cutover Road to Northbound Schaefer Road to Eastbound Michigan Avenue (US-12) and ending at Miller Road.

*Southbound: Eastbound Rotunda Drive traffic will be detoured with signage utilizing Eastbound Rotunda/Schaefer Cutover Road to Southbound Schaefer Road to Eastbound Mellon Street to Eastbound Dix Avenue and ending at Miller Road.

Miller Road notes:

*Miller Road, south of Rotunda Drive, will be open to local traffic only between Eagle Pass and Ford Motor Company Gate 6.

*Miller Road, north of Rotunda Drive, will be open to local traffic only between Southern Avenue and Oakman/Prospect St.

*Plant traffic can access I-94 Freeway at Michigan Avenue (US-12). To get to I-94 use the northbound Miller Road detour route.

FOR MORE INFORMATION

· Contact the 24 hour customer service center at 888.ROAD.CREW (1-888-762-3273)

· Visit - www.waynecounty.com

· Residents and visitors can subscribe to email notifications of bridge updates, construction and maintenance updates and news in their communities via waynecounty.com (https://www.waynecounty.com/departments/publicservices/roads/road-construction-updates.aspx)

· Residents and visitors can subscribe to receive push notification updates to their cell phones by downloading the Wayne County Mobile app. The app is available in the Apple App Store (https://apps.apple.com/us/app/wayne-county-mobile/id1449796370?ls=1) and Google Play (https://play.google.com/store/apps/details?id=com.waynecounty.wcMobileApp)

ABOUT WAYNE COUNTY DEPARTMENT OF PUBLIC SERVICES

The Department of Public Services consists of six divisions, which include Administration, Engineering, Equipment, Parks, Roads, and Environmental Services. The department oversees, maintains, and operates the county's unique assets and complex infrastructure for nearly 2 million residents.